Font Size: a A A

Research On Management Problems And Countermeasures Of Central Asian Transnational Natural Gas Pipeline Construction Project

Posted on:2019-04-29Degree:MasterType:Thesis
Country:ChinaCandidate:P T XuFull Text:PDF
GTID:2381330572463641Subject:Project management
Abstract/Summary:PDF Full Text Request
The Central Asian natural gas pipeline is a vivid annotation of the good-neighborly friendship and cooperation in the international region.It condenses the precious friendship between China and the Central Asian people,occupies a strategic highland of energy cooperation,and acts as a pioneer and practitioner of the “Belt and Road”.New legend.The Central Asia Natural Gas Pipeline Project is a valuable practice for China Petroleum's overseas investment,engineering construction and project management.Petro China will promote cross-border energy cooperation to a new height of internationalization,standardization and marketization in terms of absorption,reference,inheritance and innovation.This paper firstly evaluates the implementation of the C-line project of the Central Asian natural gas pipeline,mainly from the significance of the implementation of the natural gas pipeline C-line project,the detailed exploration of the previous pipeline construction,the pre-construction design of the pipeline construction and the land acquisition management along the pipeline laying.From the investment decision,financing planning,capital planning and control of the Central Asian natural gas pipeline project,the paper discusses in detail the many difficulties encountered in the project implementation process and the specific solutions.After the natural gas pipeline in the actual construction process of the project management,how to creatively put forward a lot of new ideas and new methods of project management,so that the entire project can be implemented smoothly.Finally,the experience and theoretical improvement of the entire natural gas pipeline project were carried out,providing project management experience and theoretical support for the future construction of foreign projects.The article is divided into four chapters.The first chapter discusses the engineering overview of the C-line of the Central Asian natural gas pipeline and the specific process of project implementation.The second chapter briefly describes the scheme of investment,financing and capital control of the Central Asian natural gas pipeline project;The chapter discusses the project management of natural gas pipelineconstruction in Central Asia;the fourth chapter focuses on the summary of natural gas pipeline projects and related theoretical improvements.Compared with domestic pipeline construction,foreign pipeline projects are more complex,and the Central Asian natural gas pipeline is more representative,mainly in the pipeline crossing the soil,Wu,Ha,and China.The geopolitical environment is different,and the construction difficulty will be Increased;pipeline construction investment is huge,construction cost recovery cycle is long;different national interests appeal,pipeline construction coordination is difficult;pipeline operation management and profit distribution involve a wide range of features,these problems can be solved one by one,and its implementation process is worthwhile Explore learning one by one.The competition for international energy resources is becoming increasingly fierce,and energy security has become a key area of national concern.at the same time,The global energy structure is undergoing profound changes,and the trend of diversification,cleanliness and low carbonization is obvious.The construction of a low-carbon,efficient and sustainable modern energy system has been included in China's energy development strategy action plan.Therefore,in the future,China will have more pipeline construction in the field of energy import.In the process of pipeline construction and maintenance in foreign countries,new problems and new problems will be encountered.Only the existing pipeline construction will be summarized and theoretically studied.In addition to project management innovation,we can have a place in the global energy game to ensure that China's energy imports meet domestic demand.
Keywords/Search Tags:project investment decision, project financing planning, project fund planning and control, natural gas pipeline project management
PDF Full Text Request
Related items