Font Size: a A A

Laos Hydropower Project Harmony Immigration To Study

Posted on:2012-08-02Degree:DoctorType:Dissertation
Country:ChinaCandidate:H L I S A T T E U R L I L I Full Text:PDF
GTID:1116330368481530Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Resettlement as hydroelectric project construction and triggered the inevitable outcome of the increasingly serious political, economic, social, environmental, and religious cultural problems, and constrains hydroelectric project construction is one of the important factors, so around governments, environmental protection armor bearer, sociologists and other academic etc, at the same time as the attaches great importance to the development of the Lao government industrial promote economic and social development policy implementation. Therefore, have scientific pertinence of Laos hydroelectric project harmonious resettlement research becomes very important, which is not only related to immigration whether can lift out, find a place for to whether can Ann instability immigrants can gradually get rid of poverty on path to riches, and directly related to the success or failure of the hydropower station. At present, the domestic and foreign for hydroelectric project construction resettlement the research target of mostly focuses on:(1) the resettlement evaluation, (2) for the assessment of ecological environmental impact, (3) social and economic evaluation a few kinds big problems. Their research methods most is the application of the traditional theory and some statistical method, and didn't use mathematical model to predict, use mathematics as a tool to quantitative measure its research results. Therefore, this thesis with project management and innovating development point of view as a starting point for the realization of hydroelectric project construction and harmonious immigration countermeasures study as the goal, to apply to the objective (goal) oriented project planning, mathematic model and index system for hydroelectric project construction and harmonious immigrants, and did research study separately for the following several parts:(1) in the harmonious immigrants as the goal, namely, in order to realize the migration can lift out, settlement can Ann's Steady, restore immigration production and living standard reach or exceed before we moved level, as soon as possible put out of poverty Trapped, the way to wealth, while on the local ecological environment has also been reasonable protection and utilization.(2) establish three system index system, such as:economic index system, social index system and environmental indicator System, to measure the hydropower project construction harmonious immigration purposes.(3) qualitative study, is applied to objective (goal) oriented project planning methods, to each specific problem Plan, analyze and solve the problem of logic thinking.(4) quantitative study, is applied to some mathematical methods, such as:differential equation, grey model, etc,The mathematical model of knowledge of immigrants progress monitoring, resumption of production life and environment issues Quantitative countermeasures study.The innovation of this thesis places that have three, namely:(1)the resettlers production and life goals, (2) objective (goal) oriented project planning in hydroelectric project construction problem analysis of applications, (3) mathematical model and the establishment of index system. Will these three together constitute a systematic analysis and problem solving, the idea of hydroelectric project construction harmonious resettlement specific planning, analysis, calculation and prediction, research, and proposes the countermeasure measures, etc.This papers is to Lao Nam Theun 2 Hydroelectric Project as an example, its study of content including:(1) study resettlers relocation progress and the about problem of analysis, and solution method; (2) study recovery resettlers of production living and its related problem of policy, and planning, and implementation construction; (3) tudy resettlers of social service system and related of problem for planning, and solution programme measures; (4) research Nakai reservoir resources of sustainable development, which including the reservoir fishing of planning and management and reservoir water pollutants of monitoring governance; (5) study resettlers placement around area of forest and land wildlife and its related of climate, of planning management measures; (6) financial inputs and countermeasures measures. This paper is divided into eight chapters.
Keywords/Search Tags:Harmonious Immigration, Resettlement, Hydropower projects, Index system, Mathematical model
PDF Full Text Request
Related items