Font Size: a A A

Research On The Construction And Management System For Chinese Large-scale Stadium Based On The Perspective Of PPP

Posted on:2013-01-21Degree:DoctorType:Dissertation
Country:ChinaCandidate:Z C DuFull Text:PDF
GTID:1117330362960592Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
With the development of economy and improvement of people's mental quality, the demands of urban residents for sports products are growing. Therefore, large-scale stadium project which is the important material of carrier in the country has been leaps and bounds. However, with the deepening of China's social transformation, Most large-scale Stadium projects'model, that is'funded by the state finance and the relevant government departments responsible for post-operational', seriously hampered the development of these projects. Based on the perspective of PPP, the paper builds a construction and management system for large-scale Stadium in social transition. Firstly, it provides a platform for private capital to enter the field of construction and management of large-scale Stadium while addresses the shortage of funds in these projects; Secondly, it introduces a professional team of construction and operation through the market mechanism to solve the problem of low efficiency.To build a construction and management system in the perspective of PPP for large-scale stadium in social transition, the paper first discusses the characteristics of the transition period, the theoretical basis and basic concepts of PPP. Then, considering the characteristics of large-scale stadium'construction and operation and present problems, the paper explains the necessity and feasibility of PPP-based construction and management system of the large-scale stadium in the social transition. The system mainly includes : the operational procedures and the participation of the PPP-based large-scale stadium; PPP-based view of the large-scale stadium construction and management system, risk management , the identification and evaluation of risk factors, and also the risk sharing mechanism of the PPP-based large-scale stadium; the operational management of the construction and management system of the PPP-based large-scale stadium; government regulation, the design of the government regulation mechanism, the proposal of the establishment of an information platform for government supervision and the post-evaluation for the government regulation of the PPP-based large-scale stadium; Finally, the paper uses empirical fact to carry out the verification of analysis which is to promote the new construction and management system for the large-scale stadium projects into practice.Based on the discussion of the paper,construction of PPP-based construction and management system for large-scale stadiums, and the design of index system for the private investment sector which taking into account the sustainable development capacity, relative ability of incorporate contracting based on the traditionally technical capacity; the paper carries out a detailed study of management system in PPP-based large-scale stadiums, uses WBS-RBS to identify risk factors, and designs risk-sharing mechanism on this basis; To ensure the public welfare of the new construction and management system, the paper designs government regulatory framework based on the Chinese reality for PPP-based large-scale stadiums in the social transition, it also considers the information platform and the post-evaluation in the government regulation.
Keywords/Search Tags:PPP Perspective, Large-scale Stadium, Construction and Management System, Risk Management, Operation Management, Government Regulation
PDF Full Text Request
Related items