Study On Control Coordination Mechanism Of Schedule And Cost In Engineering Project

Posted on:2006-09-18Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiFull Text:PDF
GTID:2132360152989779Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
As the major aspects of engineering project targets control, schedule and cost are very important content on each progress of project, also are the core tasks of each unit in the project construction. The two aspects which has effect on each other are united. The purpose of carrying out schedule and cost control of the project is aim to the project's destination beforehand and the best control level. Based on studying the two targets' defects, effect factors, basic principle and methods, countermeasures and advice which should be taken, the paper discusses and analyses these content: 1.Based on the basic principle and thinking of cybernetics, this paper discusses the basic principle and methods, at the same time analyses the principle, content, progress and methods of schedule control of engineering project management, also summarize the corresponding actions that should be taken. 2.In order to know about developing conditions all-around of engineering project management and achieve to control schedule and cost more effectively, the paper has collected many experts' advice in Shaan'xi province by using construction project questionnaire. Thereby the paper draws some useful conclusions through summarizes in particularly. 3.In order to quantitatively conduct the application of engineering construction and generally master relevant reference or quantity criterion that could evaluate schedule and cost of engineering project, this paper has grasped the first-hand datum by using construction project questionnaire. Via a lot of work on the large datum, this paper studies schedule and cost's control index values of engineering project by way of different functions and structure types in Xi'an. 4.The paper studies relationships that affect each other and control coordination mechanism of engineering project. Based on relevant theory of Synergetics, this paper raises optimum control model on influencing of resource and climate. The paper discusses and analyses significance, content, coordination techniques and methods etc. of engineering project organizing coordination.
Keywords/Search Tags:Schedule, Cost, Control, Coordinate, Index value
PDF Full Text Request
Related items