Ningdong town will develop fast along with the construction of the base of Ningdong energy and chemical. The distribution network need to be planted according to the development of Ningdong town. The paper analyzed the actuality distribution network of Ningdong town and pointed the problem of the distribution network. According to the plot of land of Ningdong town, the load was forecasted by load density method. The load level of year 2001, year 2015 and year 2020 were given. The demanded power energy of the three periods were also given. Based above the power supply planning projected and the distribution network planning projected planning projected were completed. The investment of the planning was calculated.
|