PIP-based Contract Management Of Owner Researches

Posted on:2007-07-11Degree:MasterType:Thesis
Country:ChinaCandidate:Z G YinFull Text:PDF
GTID:2132360185459310Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
Knowledge-based economy ages, information-based have already become the important means that pushes society development. However, the building industry is consistent to get behind with other professions at the new technique applied aspect, this kind of circumstance is particularly obvious in our country. Information-based is opportunity, is also challenge to the building industry. Information-based will never be a pure technique problem, its implement process is also the process of the management principle renewal. This process not only needs to be prop up with its related management theories, but also wants to have the adequacy management method again. Only by this way, the construction process can adapt the information-based technical need, then can raise the management efficiency of the building industry, increase the competition ability of ourselves.In our country, though a series of information-based policy in the building industry have been put forward , the information-based researches and applications are still placed in the early stage. Project Information Portal is the information-based means of the project management that the developed nation adopts more. Its most function is to provide information exchanges for the project participates. The project participates can coordinate and control the project by make use of its strong exchanges and information shared function. But, such as front say, information-based can not get away from the support of management theories, PIP is also such. For the sake of better applying of it in construction project management, to research the system of whole construction process is essential.The owner is the total responsibility person and the gather of construction project management. Its management ability and level decides the success or failure of the whole project. In project construction stages, in addition to nine contents of project management, owner still needs work " three controlling , two management and one coordination" well. Its management contents are of complexities. By systematical analysis, the text explicit important position and function of contract management of owner in project management, and take this as a start order to research information-based of construction project management,...
Keywords/Search Tags:Construction Project Management, Project Information Portal, Owner, Contract Management
PDF Full Text Request
Related items