Font Size: a A A

The Developments Project Construction Bids Strategy Research

Posted on:2007-05-09Degree:MasterType:Thesis
Country:ChinaCandidate:L X YaoFull Text:PDF
GTID:2132360212958558Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
Along with our country national economy with the demand that society development, Hydrelectric developments scale is more and more, Toward development of construction enterprise, Since it is an opportunity and it is challenge. Construction enterprise exists with develop for the sake of the oneself, Only passing to recruit to bid to obtain project. This text passes the problem that author exsits in business enterprise that start construction career worked period, Combination establishment mark book and its bid quote process, Introducing the engineering recruit the definition of the hurl to recruit the basic procedure that bid with the basic characteristic, engineering, and the engineering recruit to bid at the our country economic function in developments with develop the condition;Explaining the engineering invites bids to mark the bottom to really settle and the bidding the method analyzes and the engineering bids inside of decision;Introduce how establishment mark book with bid to quote, and bid to quote the process the strategy that inside should adopt with technique and how to proceed the engineering bid the risk identifies with against etc..At draw lessons from the author bid experience in the process with teach, tally up the construction business enterprise to mark the book with bid to quote and bid the strategy that quote in the establishment to make use of with the technique. How to choose to bid object, establishment mark book, get around the risk, biggest limit obtains the engineering profits is each a construction business enterprise to extremely pay attention to lay equal stress on to order investigative lesson. This text sets out from the undertaker's angle, earnest analysis invite bids, bid whole process, for undertaker choice bid object, reasonable offer, get around the contract risk, increase inside mark the probability, biggest degree obtains the profits puts forward the some slices solid viable suggestion, the dint diagram contracts for to the construction the business enterprise bids to work to rise certainly of actuality guide meaning.
Keywords/Search Tags:Invite bids, To bid, To quote, Strategy, The technique, Risk
PDF Full Text Request
Related items