Font Size: a A A

Application Of Horizontal Road Network Overall Planning Method In Municipal Engineering Project

Posted on:2009-03-12Degree:MasterType:Thesis
Country:ChinaCandidate:H LiuFull Text:PDF
GTID:2132360245987641Subject:Project management
Abstract/Summary:PDF Full Text Request
Municipal projects usually have the following characteristics: The first one is the high degree of complexity and large number of participants; the second one is high cost and many stakeholders; the third one is that projects have many uncertain factors and they are usually influenced by the impact of the external environment; the fourth one is the strong political goal. It requires modern management techniques and methods in management of the project, in order to ensure that the limited resources can achieve the desired objectives. This paper has studied time and logic features in the project management. Combined with certain municipal construction experience, it also has made common horizontal road chart and network overall planning method to be the manpower low technology of horizontal road and network. And it has formed new project plans and control tools. Its overall coordination has compensated a series of defects which involve no connection in horizontal road, not reflecting critical path and being unbeneficial for limited relation of quantitative analysis. And it also improves difficult situation that the logic convergence is hard to be finished in Mono network and the timelines cannot regulate progress. This technology integrates technological characteristics of Gantt chart and network, which is easy to understand, to learn and to utilize. It would be suitable to popularize this study in construction because it promotes the tool method of planning and controlling, achieves the tight connection of design and construction, decreases the complicated steps of organization and coordination, and provides strong basis for rational period, quality and cost in municipal projects.(1) Study on the theory stage, it analysis project subjective and objective process, verify logic relations and time, decide on symbol and chart, if these conditions are ready and then it can be supply the theory basis for Horizontal Road Network Overall Method.(2) Study on the method evolved stage, it improve trouble for Horizontal Road Chart and Network Planning Technology, and then bring out work-time-logic compound plane by work-time and time-logic . At the same time, when turn arrow in Horizontal Road, it become a new type of planning and controlling tool what means Horizontal Road Network Overall Method. It can settle that Horizontal Road Chart and Network Planning Technology' s construction problem.(3) Study on technology contentstage, it expounds that characteristic, chart, measure, It is clear that the new tool meaning in depth step.(4) Through practical application of this new project planning and control tools in Qingdao Olympic sailing supporting projects - construction of urban sewage treatment plants, it has realized the cross-cutting operations of design, civil engineering and installation that ensures scientific converge among the various department and dynamic equilibrium of multi-resource scheduling.(5) The total period could shorten 22 days, with the total investment cost declined 2.8 percent to meet requirements and expectations of related staff. It prove that there are feasible, improve, visual in Horizontal Road Network Overall Planning Method for application of Municipal project.
Keywords/Search Tags:Municipal Engineering, Horizontal Road Chart, Network Planning Technology, Planning and Controlling, Horizontal Road Network Overall Planning Method
PDF Full Text Request
Related items