Font Size: a A A

Project Management Of 10kv Power Grids Planning In Changbai District Of Shenyang

Posted on:2011-06-24Degree:MasterType:Thesis
Country:ChinaCandidate:W QuanFull Text:PDF
GTID:2132360305957512Subject:Project management
Abstract/Summary:PDF Full Text Request
Shenyang is the Northeast area key city, Along with promotes Northeast strategy statement, Has provided the opportunity for Shenyang's development. The Shenyang metropolis area's development outward already became the development the inevitable trend. And south developed for the Shenyang long white area development has provided the opportunity. The long white area's geographical position is superior, Located at mix landscape belt's west section, Along with Hunhe River coast environment unceasing promotion, The long white local development's superiority even more highlights. Long White island is above Hunhe River the true ecotype islands, It is situated at Shenyang north and south Jin Lang, on the thing silver belt's crossover point, Is north Shenyang develops, constructs Shenyang's bridgehead according to the south,In the future Shenyang modernization metropolis symbol.Carries on the construction in the long white area not to be able to leave electrical power system's electric power support, The electrical network construction needs to be able to follow urban construction's step.Shenyang long white area 10 kilovolt and above electrical network plan, Must first be coordinated with the Shenyang city electrical network overall plan, Unifies the Shenyang long white area electrical network present situation, With long white local development construction coordinated development. This local electric power network plans the total principle is, "plans in advance, the science plan, step by step implements"; In satisfies the Shenyang long white area to grow day by day uses electricity the load demand and under the guarantee electrical network movement safe reliable premise, Establishment technological advance and economical reasonable electrical network.Because the city and countryside uses electricity the load growth to be rapid, Uses electricity the structure to change, The industry using electricity proportion reduces, The resident uses electricity with the trade uses electricity the swift growth, Causes the electrical network valley peak to enlarge.On Shenyang peaceful district magistrate the white area, The plan goal constructs into a collection trade, occupies a body's ecology city, This indicated in the long white area, The resident and the trade uses electricity occupies the majority. Because our country mesolow distribution network load, the voltage have been low, the reliable bad shortcoming will be able to be getting more and more obvious, Bring the adverse effect for the urban economy development and the lives of the people to be getting bigger and bigger, Even influence to social order and security stable problem. Speeds up distribution network's construction, Optimized power distribution network architecture, Not only may safeguard the electrical network safe operation, reduce the electrical network to lose, to improve the electrical energy quality and the reliability, May also raise electric power enterprise own economic efficiency, adapt the market economy fast development request, Enables the distribution network to be able maximum limit to satisfy the social economy the development and the living standards enhancement to the demand which uses electricity. Comprehensive plan and transformation distribution network, Can reduce the capacity request effectively, Reduces the network the loss, Reduced construction investment, Enhances the Electricity company manpower and resources resources the use factor, Reduces the construction investment and the maintenance cost effectively, Bring the considerable economic efficiency for the country and the Electricity company.Although the Shenyang long white area distribution network had certain development, But still had certain problem, Is affecting the local need to develop. This article has carried on the redesign in view of these questions to distribution network's plan. Including formulation distribution network plan goal as well as determination distribution network plan principle, And to shoulders carries on the predict that,Finally carries on the design to the local distribution network.The author through the literature methodology, the investigation methodology, methods and so on systems science method has conducted the research to the distribution network plan question. This article altogether divides into five parts.The first part is an introduction. The author introduced in the introduction this topic's selected topic background as well as has carried on the simple introduction to the Shenyang long white area 10kv distribution network planned project; Meanwhile also performs to the selected topic significance and the necessity to discuss, Introduced the long white local construction importance as well as the distribution network plan necessity; Then project management's correlation theories knowledge which uses to this article in has carried on the elaboration, And was summarizing the research technique which as well as the content structure finally this article uses.The second part elaborated the Shenyang long white area development present situation and the development targets. The third part has discussed the Shenyang long white area electrical network present situation and the existence question. This chapter briefed the Shenyang long white area electrical network construction present situation, And proposed the local electrical network construction still existed question. The fourth part discussed the Shenyang long white area electrical network development project. The author uses the project management correlation theories knowledge which studies, Unifies the long white local electrical network construction present situation, Developed how to the electrical network to carry on the plan to carry on the detailed discussion. The fifth part has carried on the summary to the full text, And has carried on the forecast to the later Shenyang long white area electrical network's development.Completes local the distribution network plan work to have the quite vital significance regarding this area development, Not only has safeguarded people's normal life, Can also provide the sufficient electric power supply for the production, Not only has brought the considerable economic efficiency for the company, Also stable harmoniously has made the contribution for the society.
Keywords/Search Tags:Distribution, Planning and design, Project management, Chang Bai district, 10KV, Lines
PDF Full Text Request
Related items