Font Size: a A A

Research On The Proposed 2×600MW Units Project Of Yuyuan Plant

Posted on:2010-02-19Degree:MasterType:Thesis
Country:ChinaCandidate:F Z LiFull Text:PDF
GTID:2132360305987865Subject:Project management
Abstract/Summary:PDF Full Text Request
This paper researches the key technology and economic issues of Yuyuna 2×600MW proposed units, which belongs to the areas of project pre-planning. This paper surveys and analysis the basic information at first, including socio-economic situation and power system status. Then planning the technical aspects of the project, including site analysis and selection, unit installed program, desulfurizationg system, coal system, water supply system and ash handing system. And then analysis and evaluates economy of the project. At last, studies the possible environmental problems, and sorts out management measures. This study can provide suggestions to its decision making and implementation and with a reference value to the similar project.
Keywords/Search Tags:load forecast, technology planning, economic evaluation, environment protect
PDF Full Text Request
Related items