Font Size: a A A

Research On The Building Of Electric Power Enterprise Performance Management System

Posted on:2006-07-19Degree:MasterType:Thesis
Country:ChinaCandidate:J DuanFull Text:PDF
GTID:2156360152483078Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
In thecondition of the mechanism change in the electric power enterprise, and theopposite weak foundation in management, this article try to establish a set of practicalstrategy-oriented performance management frame model that would be useful on thefoundation of the original and general models. The target management method, the method of BSC(Balance Score Card) arewidely accepted the management methods by the advanced business enterprise all overthe world in recent years, but it is opposite less to the combinative applied theoriesstudies and substantial evidence. according to consults in the electric power enterpriseexperience, I join the three methods together to design the strategy-oriented performancemanagement model that can be used. In this model, the thought of MBO(management by object) is added in,which canmake this model come close more to the present management condition of the electricpower enterprise.
Keywords/Search Tags:performance management, strategy, BSC, business process
PDF Full Text Request
Related items