Font Size: a A A

The Excellent Design And Evaluation Of Labor Ration In The Wheel Company

Posted on:2006-05-02Degree:MasterType:Thesis
Country:ChinaCandidate:D Q LiFull Text:PDF
GTID:2166360155454698Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The wheel company is the more large domestic automobile parts enterprises, and the species and abilities of wheel product be placed in to lead the position in the domestic, but in vehement market competition, because of influencing factors of lag of various managements work and raw materials markup etc, It is facing the threat of the deficiency. This text aim at the problems of the management aspects of labor ration of the wheel company , by means of the questionnaire to the related personnel and comprehensive analyses , find out main reasons of the influence the company labor ration management level . by the reference to the successful aspects of labor ration management of the same domestic and overseas enterprises , I designed excellent the project, that is the excellent project of producing locale, the excellent project of the producing technics and the excellent project of the manufacture flow .By the practice of experimental unit and its result, proving that this project is successful, attaining to aim of raising the company management level of labor ration. (A) The establishment course of labor ration of the wheel company is strictly according to the company craft document and old the data of labor ration .The whole course is as follows: 1, According to technique man-hour ration and number of worker in 《the control plan 》,which is made by the technique center ,to certain erery working procedure homework time and the number of operation worker of labor ration. 2, Refer to related data of the company 《the list of the material ration 》and manual of 《the labor ration time standard 》, to certain the product additional time of labor ration. 3, According to the acquisition data of the front two work, to plus the homework time to additional time, then getting a working group time of the procedure, then to use a working group time to multiply number of the worker, getting a product working procedure time, the man-hour ration of the product is equal to sum of the working procedure time of all procedures; The output ration of the working procedure is equal to 480 minutes of a day dividing the working group time of the procedure, but the output ration of the product takes minimum value of number in the output rations of the working procedure. 4, After checking and proofreading of various labor ration data that is made, ration administrators use the software of EXCEL to typeset it, and make the labor ration list, then deliver it to the finance department and every related workshop. (B) The existent problem of the wheel company in labor ration management mainly expresses at: 1, The equipments in workshops is aging and the phenomenon of overrun life limit is serious, and rate of malfunction is high, the time of no use is many, so affect the produce coherent and the produce ability. 2, The craft personnel are busying resolving the technique problems that are met again and again in the production, and the workers also follow the traditional work method , so in the aspects of removing the bulky manual labor and invalid labor, the improvement of safety assurance facilities and the improvement of weak aspect of each procedure of production line, nobody grasp. 3,The technique man-hour in the craft documents of 《the control plan 》etc. provided by the technique center is made by the technique parameter of the equipments, and homework time of labor ration according to it is not obviously enough accurate, and the number of the procedure worker also lacks enough science. 4, The manual of 《labor ration time standard 》that is the base of additional time is already dated, it impact science of the establishment of the labor ration. 5, See from the establishment process of the labor ration, It neglect realistic on the scene, and the whole process of labor ration from first draft to check, auditing until the final text is made by one person, this kind of process brings the mistake very easily and impact the accuracy of the data. 6, Because the establishment of the labor ration lacks science , there is not authority in the management, and it is usually changed because of various reason, that serious impact daily management of labor ration. (C) On the base of investigate and analytical , and drawing advanced management experience, this text puts forward to the wheel company labor ration excellent project according to the existent problems of labor ration...
Keywords/Search Tags:Labor Ration of Enterprise, Excellent Design, Evaluation
PDF Full Text Request
Related items