Font Size: a A A

The Project Management Of Qi Chen Computer Company

Posted on:2006-10-06Degree:MasterType:Thesis
Country:ChinaCandidate:H C ZhangFull Text:PDF
GTID:2166360155468735Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In recent years the information-based application of our country obtains to make the achievement that person focus attention. But, along with information-based continue to push forward, the information-based item success rate low and information-based application and businesses join together not close etc. antinomy and problems of the deep time to expose out continuously. The CIO is the information-based director, how take" the IT manage" as the total frame, from the angles, such as IT item quantity, time and cost…etc., strengthen the direct of the item of IT and manage, have the very important meaning to the information-based construction successfully.The IT item management includes the technique, management and serves three aspects, among them, the technique is a foundation that acquires and carries out the item, management is complete the item of guarantee, and the service then acquire a newly arrived source of the additional profits, can also see make is the extension of the item management.First, this text is for the domestic and international present condition of the IT item management, the widespread and existent problem of IT boundary and the source that it produces carried on the analysis. The abroad contain a lot of item method system for models, but suit the item of IT also not much; Local start night, in addition to the software item compare model, the system gather item because involving the course to have another, the knowledge face widely, can hardly become a set of in general use method system, at organize the structure, management system, scope, time and cost to exist a lot of problems. The next in order, studied the foundation theories to carry on the overview to the thesis, and carry on the introduction and comparison to various organized form, and put forward and did not good of or bad organization structure, only suited for theorganization structure that is not suitable for, is a later design to lay the foundation. Then, take the company of Qi Chen as the object; manage the series problem of the implement to launch the research for the item of IT. The concrete problem that aims at the company of Qi Chen to exist now carried on the detailed analysis, aiming at to put forward a set of solution sexually on this foundation. Put forward the homologous leading thought and set up the principle under the company leading of strategic target, around the organization structure, management system, scope, time and cost puts forward the concrete suggestion, set up a set of in brief practical project management system, and find out to carry out this kind of method system path (the foundation prepare, structure adjust, organize to enhance and overall implement) and correspond the counter plan of the aspect. Pass finally together and together the construction of the Qi QiHaEr university campus net to take into in a specific way implement of explain that item method system, and the other party method system carried on the result evaluation.
Keywords/Search Tags:Project management, Company of Qi Chen, The item organization
PDF Full Text Request
Related items