Font Size: a A A

No.3 Boiler Expanded Project Scheme Of Heat And Power Plant

Posted on:2006-01-01Degree:MasterType:Thesis
Country:ChinaCandidate:Q J YangFull Text:PDF
GTID:2179360155963504Subject:Business Administration
Abstract/Summary:PDF Full Text Request
This article carries research on No.3 boiler expanded project scheme of heat and power plant of power & light company of LuZhou. An all-round analysis and demonstration on the project, such as project background, market, production technology, site of factory, security & environment, human resources, implementing planning and controlling, finance, uncertainty, risk, etc. are presented here.The project scheme analyzed the environment, current market and future development trend of the area where the heat and power plant lies in by using various kinds of chart tools, and confirmed the goal market. The article still applied Michael Potter's competitive strategy theory to the competition analysis. On this basis, the article adopted marketing strategy of the best product & service and low-price to realize market-selling goal. According to the technological development, XISHUI blind coal is chosen as the fuel and circulation fluidized bed combustion (CFBC) technology is chosen as the key technique on the basis of comparison in detail and the suitable production scale is confirmed.The scheme carried meticulous exposition on the host, fuel, electric system, heating power system, burning system, fuel transportation system, dirt-removing system, water-supply system, comprehensive utilization of gray and dreg, control system of thermal technology, etc.. The article also proved to such respects as corresponding environmental protection, labor safety and hygiene, etc.. On this basis, the comparatively accurate project investment and the arrangement to the capital source and application plan is get.According to the methodology of economic evaluation of electric powerconstruction project, writer estimates the project investment in detail, so as to study the financial affairs preliminary feasibility; the financial affairs appraisal linking model of the project is exploited by using EXCELL software, which realizes corresponding report forms data change along with financial factors' changes. The paper uses this financial linkage model to discern and evaluate the financial risks of the project and makes corresponding risk precautionary measures.The financial analysis and evaluation indicates that the loan of the project will be paid off in the 5th year, the investment callback period is 5.31 years and the investment yield ratio is 23.51%, far higher than trade base earnings ratio by 12%, and its profit ability is extremely strong, and other indexes of the project are superior to the average level of the trade too, which proves that this project is feasible on the financial affairs. At the same time, the analysis of technology, production, environmental protection and risk shows that it is an environmental protection project with remarkable social benefit.
Keywords/Search Tags:Boiler, Enlargement, Project, Scheme
PDF Full Text Request
Related items