The Research Of ZhongShan HengMen 125MW Gas-fired Boiler Overhaul Project Schedule Management

Posted on:2010-06-03Degree:MasterType:Thesis
Country:ChinaCandidate:M J LiuFull Text:PDF
GTID:2189360275984660Subject:Project management
Abstract/Summary:PDF Full Text Request
With the increases in the number of units and single-unit capacity, the time that maintenance personnel can be used to prepare overhaul is reducing gradually, so the research of the boiler overhaul project schedule management has important practical significance. Refer to the development of the project schedule management in the civil and the world, think of the practice of the Power Plant A Class overhaul, take the boiler overhaul CPM as the master line, by the Work Breakdown Structure (WBS) and the overhaul job file package, to study how to control the undesirable effects which may slow down the project. At the same time also discuss the application of the Theory of Constrains (TOC). The article will be benefit to the power plant.
Keywords/Search Tags:the Work Breakdown Structure, job file package, CPM, boiler, overhaul
PDF Full Text Request
Related items