With the increases in the number of units and single-unit capacity, the time that maintenance personnel can be used to prepare overhaul is reducing gradually, so the research of the boiler overhaul project schedule management has important practical significance. Refer to the development of the project schedule management in the civil and the world, think of the practice of the Power Plant A Class overhaul, take the boiler overhaul CPM as the master line, by the Work Breakdown Structure (WBS) and the overhaul job file package, to study how to control the undesirable effects which may slow down the project. At the same time also discuss the application of the Theory of Constrains (TOC). The article will be benefit to the power plant. |