Font Size: a A A

Research On Cost Management System Of Construction Project In Architectural Engineering

Posted on:2007-05-28Degree:MasterType:Thesis
Country:ChinaCandidate:Y X CaiFull Text:PDF
GTID:2179360182491028Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
At present, most researches on cost management of construction project pay more attention to the control and the management of constructs product, neglecting the study on the main body of the works and the influences of organization optimization and advanced cost management idea and the method. But along with the social economy development, the enterprise faced with more and more drastic competition. Many factors make it necessary to establish perfect cost management system of construction project. These factors include the status and the function of the cost, the limitation of the traditional methods in reducing the cost, the development of the business management thought, the establishment of modern enterprise system and so on.The establishment the perfect cost management system of construction project must be under the guidance of scientific management thought, which are summed up as six fundamental theory categories in the second part of this article: Cost Attitude, Cost Efficiency, Cost Reduction, Cost Avoidance, Total Life Cycle Cost Control, and Cost Driver.The third part of the article elaborated the content of the cost management system of construction project.The fourth part is the emphases of the article, elaborates the establishment and control of cost management system of construction project. Through the summary and introduction of advanced method and experience produced in the costs management practice inside and outside our country, the article put forwards that it is necessary to take following methods to standardize total cost management of construction enterprise:Firstly, hold VE analysis to reduce the construction project cost.Secondly, carry out standard cost control and analyses cost variation.Thirdly, use the experience of Target Costing for reference.Fourthly, study the experience of Simulating Market Accounting of Handan Steel Works.Fifthly, improve cost count means and carry out Activity-Based Cost.In short, the goal of the paper is to reveal the present situation of cost management in construction enterprises, urge construction enterprise to strengthen the interior cost management, promote the cost management of construction enterprise to go along in the track of standardization and in the end enhance economic benefit...
Keywords/Search Tags:construction enterprise, cost management system of construction project, standardization, economic benefit
PDF Full Text Request
Related items