Font Size: a A A

Feasibility Study Of Electricity’s Generation From Trash-burning-down In City Life

Posted on:2015-08-10Degree:MasterType:Thesis
Country:ChinaCandidate:S G LiFull Text:PDF
GTID:2181330467960161Subject:Business Administration
Abstract/Summary:PDF Full Text Request
All countries in the world is currently faced with garbage overrun with reality, the line of sight of countries no longer stay on the question of how to control and destroy the garbage, but rather take a positive attitude and effective measures for scientific treatment, use of garbage, trash as "the second resource". Waste incineration is one of the effective ways of solid waste disposal, incineration is reduction effect is good, the advantages of incineration residue after volume reduced by more than90%, reduce weight more than80%, with complete, low pollution, and waste of secondary energy, such as organic fuel contains high calorific value, according to the scientists calculate burn2tons of waste heat equivalent to about1tons of coal. Large urban waste output in our country, but the waste incineration power generation in starts late in our country, development is slow, although have tried in some economically developed city, but to promote the effect not beautiful, hi view of the waste incineration power generation to save resources, improve the environment, realize the sustainable development of the country is of great significance, for the waste incineration power generation project objective, comprehensive and in-depth feasibility study is very necessary.Based on the above background, this article through to the BM area natural condition and social economic situation and the analysis of the development plan in the BM area construction garbage incineration power plant is imperative. So the feasibility study on the BM area waste incineration power generation, using literature theoretical research and empirical analysis, economic analysis method from the aspects of technology, economy and risk comprehensive analysis, the waste incineration power generation project construction, the promotion provides strong evidence.In this paper, a total of seven chapters. Chapter one introduction:introduce the research background, research significance, research contents and research methods. Second literature review:respectively for feasibility method and current research situation at home and abroad of the relevant concepts, including feasibility study, financial evaluation, etc. Chapter iii project. Introduce the BM area survey and the advantage of garbage incineration power generation project. The fourth chapter, from the Angle of technology, BM area incineration power generation project feasibility analysis. Including the selection of waste incineration technology, the determination of burning process and burning system configuration. The fifth chapter from the perspective of economy, the BM area incineration power generation project feasibility analysis. From the project investment estimation and financing for specific analysis. Chapter6from the perspective of risk and countermeasures, BM area incineration power generation project feasibility analysis. Including the risk factors and the corresponding coping strategies, etc. Chapter vii conclusion. Living garbage incineration power generation project in BM area implementation feasibility analysis conclusions and recommendations.
Keywords/Search Tags:incineration power generation, feasibility study, BM area
PDF Full Text Request
Related items