Font Size: a A A

Research On Investment Control Of Garbage Incineration Power Project

Posted on:2012-12-29Degree:MasterType:Thesis
Country:ChinaCandidate:J G ChangFull Text:PDF
GTID:2189330335453862Subject:Project management
Abstract/Summary:PDF Full Text Request
It is obvious that municipal life refuse are over run all over the world. The urgent measure is not how to control these garbage but effective disposal by positive measures. Garbage disposal takes "Reduction, Reuse and Recycle" as the goal. Municipal life wastes can be "recycled, reused and reduced" at garbage incineration power plant. It is worth carrying out more research. On account of significance of waste disposal, such as economizing energy, improving environment, more and more garbage incineration power project will set up. The cost control in life garbage incineration power project is the same as a normal project, but there are specialist of its own. So, it is necessary to control the cost of project.The paper introduces the basic content of construction cost management and the significance garbage incineration power project to city life, the science economic evaluation and cost control objectively, may for the collaborator, the investor and the loan provides the more policy-making support, is advantageous to this profession benign development. Its cost control method and the general project compare, has same place, but took a special profession, can meet some new questions in the appraisal process trend to solve, like financing way, income origin, cost control and so on. the investment controls of such five respects as investment decision stages, design stage, tender and invite tender stage, construction stage and completion settle accounts stage which affected the project investment, and put forward to strengthen each investment control link of the whole course.At present, every investment control stage still exist many problems, this paper according to the analysis of the problems which exist in each investment control link, discussed the counter method and suggestion to do the investment control work, expect it can have a guidance effect on the real project.
Keywords/Search Tags:Municipal life refuse, Garbage incineration power, construction Project, investment control, project cost control
PDF Full Text Request
Related items