Font Size: a A A

Study On The Informationization Of Network Operation And Maintenance Scheduling Based On Logistics Management

Posted on:2011-11-03Degree:MasterType:Thesis
Country:ChinaCandidate:B N LaiFull Text:PDF
GTID:2189330338986342Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Since the competition between telecommunication operators being intensified, how to save the operation cost has been there common concern goal. As the operating costs of network maintenance department is an important spending department, improve the management efficiency and save maintenance cost, operation and maintenance of network maintenance management was established.In this paper, how to enhance the efficiency of the network management operation and maintenance resource allocation by informationis the goal. Through the study of relevant theoretical knowledge and research, to learn foreign applications similar to the mature experience, put forward on the operation and maintenance of logistics management based resource scheduling information program.First, this paper begin from network maintenance and management's current situation of the Dongguan mobile communications company, from the network size, management structure, focus, resources and information on behalf of Victoria the status of the construction of an in-depth analysis. Concludes: "the implementation of equipment information management resources", "to carry out a problem for the inefficient process of re-start the process of targeted" and "building operation and maintenance of electronic systems," the operation and maintenance management to improve or upgrade needs.Second, around the operation and maintenance management needs of improvement of the proposed standardization of information based on the use of advanced logistics management experience, the use of RFID, intelligent resource management technology to improve the efficiency of resource management equipment; demand under the operation and maintenance management new requirements for the new period is proposed to carry out the process of re-targeted to achieve the traditional operation and maintenance operation and maintenance management to "focus on operation and maintenance, services, operation and maintenance" of the change; on the basis of the above proposed based on "3G" technology, operation and maintenance scheduling management system-building programs.Finally, avoid falling into the "IT black hole", to achieve the successful implementation of information technology point of view put forward based logistics management, operation and maintenance scheduling information implementation of specific evaluation performance evaluation.
Keywords/Search Tags:Modern logistics, Operation and maintenance management, Informationization, Process reengineering, Performance evaluation
PDF Full Text Request
Related items