| Based on the existed researching progeny of the project post-evaluation, the post-evaluation problem of the electric power generation unit project was studied in this paper.Firstly, the former researching on the post-evaluation was sum up by the numbers. Then, considering the property of the electric power generation unit project, the evaluation indexes system was build up. After comparative researching on the different evaluation methods, introducing the vary modulus theory, the integrated evaluation method and mode of the Hong-he power generation double thirty million watt unit project was proposed up. Last but not least, the relative data was collected, and the post-evaluation conclusion and the advice in the subsequent operation aspect were put forward according to the former proposed method and modes. |