Font Size: a A A

The Post Project Evaluation Of The Thermal Power Generation Project In TongLi Power Generation

Posted on:2009-03-10Degree:MasterType:Thesis
Country:ChinaCandidate:X F LiFull Text:PDF
GTID:2189360275484919Subject:Project management
Abstract/Summary:PDF Full Text Request
The post project evaluation is the necessary link of the project cycle, an indispensable important part of decision-making management of the project. It is significant to improve the decision-making level of the project and improve returns on investment. As China's deepening of the power's reform and the system reform on Investment and financing. The restriction which the market give the investment's behavior is increasingly strengthened. To establish and improve the post project evaluation has already been a new task which is confronted with the system reform on Investment and financing. In this paper, the details of the post project evaluation on engineering construction are infered. The theory, method and application of the post project evaluation is systemicly researched in this paper. And the thermal power generation project Tong Li Electric Power Company is regards as a case."With and without comparsion method"and"the logframe approach"the evaluation, a more systematic approach is applied in this paper. The implementation, operation, the benefits of projectsand the benefits'influence of Power construction projects are analyzed by postevaluation. The problems and experience of the details mentioned above are summarized and probed systemticly. The last, the conclusions are given elaborately.
Keywords/Search Tags:Tong Li Electric Power Company, the thermal power generation project, the post evaluation, content, method, the applied research
PDF Full Text Request
Related items