The Studies Of The Entire Proceeding Cost Control Pattern Of The Overseas Petroleum Project

Posted on:2008-11-03Degree:MasterType:Thesis
Country:ChinaCandidate:X H FengFull Text:PDF
GTID:2189360212987066Subject:International Trade
Abstract/Summary:PDF Full Text Request
Our country petroleum resource taking the place of contradicts in recent years being outstanding very, in the homeland petroleum relative inadequacy of resources, enter port depending on degree enlarge. Specifically for this one condition , our country Petroleum Company have worked out the new development train of thought, be "to develop host camp business energetically , to open up overseas market , the improvement of economic results making great efforts actively , realize enterprise sustained development ". But increase by step by step being accompanying our country overseas petroleum project's, control method and the technology have revealed lower cost of tradition management control pattern gradually out a little problem and deficiency, more and more inadaptable international petroleum marketplace request, urgent need builds a set of new cost corresponding with international petroleum marketplace control of production cost method hierarchy of control. For this purpose, the main body of a book on going deep into the basis studying cost controls a base and requires that cost is as well as control theory, be tied in wedlock the cognition that petroleum project cost composes to overseas, the reality putting control of production cost into practice from overseas petroleum project needs to start off, control bringing forward the overseas petroleum project needing the cost carrying out the entire proceeding. The principle , target should put economy principle into effect, controlling all round control principle , dynamic control principle , right duty benefit combine principle each other in managing practice. The luck managing priority needing to ascertain the gear managing mechanism's to four has composed overseas petroleum project entire proceeding , is to be going to finish assuming project cost budget administration in project initial stage basis WBS first , is going to follow thin melt cost keeping according to ABC during the period of cost happens, real time transporting the rate of progress and cost being in progress in doing process judging by EV method concretely in project controls , the all-round valuation being in progress with BSC implement after the project is over analyses finally.Case analyses the main body of a book as managing the accountant application study problem , giving first place to standard demonstration, being subsidiary , has draw lessons actively meaning having brought forward new our country Petroleum Company overseas petroleum project control of production cost train of thought , having controlled to our country Petroleum Company in the present stage sharpening overseas petroleum project cost.
Keywords/Search Tags:The overseas petroleum project, Manage of cost, Control of cost
PDF Full Text Request
Related items