| Quality control is not only the foundation for the existence and development of enterprises,but also the most competitive and the essential factor of companies.Quality control is the quality of command to coordinate their activities as a science.Its evolution has gone through three phases:quality test,stastics quality control and total quality control.Toyota total quality control is developed from the concepts of famous Dr. Deming, Toyota founder Mr Sakichi and Mr Kiichiro.The new theory include"policy management","day-to-day management"and"enhancing vitality".Manufacturing site for product is the most important aspect of quality.Toyota manufacturing site play a role as quality maitainning.Its idea manifestied mainly as the following three aspects:quality assurance within process , the next process is the customer and in place to prevent problems.All the quality activities and methods in the manufacturing site should be able to manage and maintain quality as the foundmental point.FAW Toyota (Changchun)Engine Co.,Ltd. is a new joint corporation by FAW and Toyota,which is manufacturing a completely new designing V6 engine.Nevertheless,it is difficult to carry out Toyota quality management in the manufacturing site because the following troubles:(1)the workers have less skills and awareness of quality.(2)the sino-Japanese staff grew in the different circumstance and background so that they have different views on the same issue,there is also communication barriers on both sides.(3)the systerm can not be continuously improved.(4)knowing less about equipment and products.Due to these limitations,site quality management rise to a number of problems,such as:(1)Frequent accurrence of quality problems coused by lacking of skills.(2)The issue feed back from customers can not find out real reason , even more to countermeasures.(3)quality information can not be delivered in time.To solve these problems , irstly , process should be put in order.Therefore,the method of quality control is being perfected.The curriculum vate of the entire process and the change-point management are adopted,which designed to find out the real reason easily.And it became a new mode for quality problems solving.The curriculum vate records resumes of the whole process so that the change-point can be traced back easily.Change-point management are four aspects:People impacting on the quality,equipments,materials and methods.The change-points of four aspects are focused on and recorded,whenever the problem happened,the number of parts and the time when happened could be find out.Through the above analysis, impact of creating a critical link in the effectiveness of the quality management system are :1. Abide by the rules of consciousness is the scene of the foundation for the effective operation of the Quality Management System.2. Site manager of the Quality Management System is recognized effective functioning of the security system.3. Raising the level of skills is the scene of sustained impetus to improve quality management system.4. the key to prevent possible trouble is to solve the quality problem in manufacturing site.To ensure the effective functioning of the scene,visual management method is used,which will be the basic rules for management of quality, visual quality of the results of operations and quality.By the visual management, manufacturing site can quickly determine the status and effect of the quality management system.Hiding from a variety of charts that analyze the issue will be conducive to take timely measures to prevent accidents from happening.Meanwhile employees can raise awareness of quality and analysis identifying problems continuously.Through regular monthly manufacturing quality meeting,processing unqualified weekly analysis meeting,customer feedback on the quality analysis , it strengthen the communication among the various departments..The ability of the quality management system is continuous improving.The operation of the process control is enhanced.Any management activities without the participation of people,if not with suitable work force,no matter how good management practices can be successful,and the training of personnel quality management system is to create the foundation for the effective operation of the scene,establishing site quality management training required is vital.Toyota field training for the quality control requirements of the site has specific talents :First make clear the scene of the basic requirements for quality management:1.Fully comply with the rules.2.The awareness and skills to discover abnormals and timely reporting.3.Managers and supervisors must persistently look anomalies over for the real reasons with the spirit of fundamental countermeasures.4.Site managers and supervisors also often target countermeasures,do PDCA constantly to improve quality.Secondly,according to the operational nature of the scene called for skills and the ability scene on the spot to develop skills required.Quality management make clear what the different nature of the work to complete the skill level,while also make clear the direction and future development of the skills training goals.Then,according to the requirements of the ability to formulate different level of skills training and according to the practical skills of each level,formulate a detailed implementation plan and training.Finally,evaluation of the effectiveness and achieve the level of skills training,and identify in later practical work to ensure the effectiveness of training.In summary,this paper through FAW Toyota V6 engine project application of quality management techniques to find out the application process constraints and problems.Through the establishment of viable quality management systems,through requirements of the site personnel training system,FAW Toyota (Changchun) Engine Co.,Ltd. has gradually formed its own enterprise culture of quality.With the application of the Toyota manufacturing quality management,the difficulties faced has been solved,the operational experience of quality management of FAW own brands has been enhanced. |