Font Size: a A A

Bottleneck Analyze And Measure Study Aimed At Scale Manufacture Of Gansu Lanke Company

Posted on:2008-11-03Degree:MasterType:Thesis
Country:ChinaCandidate:H T ZhangFull Text:PDF
GTID:2189360215957526Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the fast development of socialism economy and china joining in WTO,as one important investing item,huge mechanical manufacture equipments bring vitality and vigor in machinery vocation. However, according to "LANKE" company conditions,it owes lots of orders because of the large demands of pressure vessles in markets to ensure manufacture system full operation,on the other hand,the company is lack of large scale producing capacity because of the bottleneck questions in manufacture process.So how to arrange manufacture capacity rightly under the present manufacture conditions and how to improve producing efficiency to reach scale manufacture become important questions.In order to resolve the questions,firstly,the paper introduce the condition and manufacture system of "LANKE"company ; secondly,using producing and operation management ideas and basic theories to analyze resources arrangement in producing systems.The first step is to find the bottleneck questions of "LANKE"scale manufacure;Then combine with enterprise manufacture elements and outer resources through inner resources united to search the relative measures,which is the OEM methods.At last,discuss the OEM management process designment and quality control questions.
Keywords/Search Tags:Pressure vessels, Bottleneck, OEM
PDF Full Text Request
Related items