Researches On The Project Cost Management And Control For Electric Network Construction

Posted on:2008-05-15Degree:MasterType:Thesis
Country:ChinaCandidate:X H BiFull Text:PDF
GTID:2189360218452184Subject:Economics and Management
Abstract/Summary:PDF Full Text Request
The charged barbed wire net construction is a foundation which relate to nationalpolicy people's livelihood construction, the investment is big, recovery period long;Theengineering which controls charged barbed wire net construction item builds price, tothe economy, social performance which raises item go to pass importance.The author sets out physically from the charged barbed wire net engineering indrawing lessons from domestic and international engineering to build the pricemanagement empirical foundation, usage possibility research, quota design, value theengineering, the contrast analysis, substantial evidence analysis and norm analysiscombine together etc. means, many angle, all-directions build a price management tolaunch a research to the engineerings.The article studied principle, standard, contents and procedure of decision, tallyingup design stage to control engineering to build the method of price, inducingconstruction stage to control engineering to build the point of price, outstandingconfidence charged barbed wire net construction the engineering build price of validcontrol of principle, analyze current charged barbed wire net engineering managementand the existent antinomy in the control, put forward understanding definitely theseantinomy of method.The article points out: The right item decision is the premise that the chargedbarbed wire net engineering builds a price management; The charged barbed wire netengineering built a price management to include a charged barbed wire net engineeringitem from sign a beginning until the engineering finishes construction a hurl luck, thecompletion finishes construction the whole processeses of final accounts, have to adoptto estimate, design investment budget estimation, start construction diagram budget,contract for contract price, engineering balance of accounts price and finish constructionthe method that the final accounts carries on a system control. The article built the working talent function in the price management to carry onthorough analysis and research in the charged barbed wire net to the current government,saying to the investment performance which insures a charged barbed wire netinfrastructure in the property the formation the process and the luck the camp process,having forward-looking meaning. And carry on thorough analysis through the reformsubstance to build the price management style to engineering, for resolved the reformdirection problem that the current government builds a price management style toprovide way of thinking worthy of drawing lessons from.Especially this text sets out from the fulfillment of work, to salt city chargedbarbed wire net the engineering builds a price management the analysis of the presentcondition and studies in recent years, pointing out a little bit existent problem and solveproblem of method, pass various research methods, put forward charged barbed wire netengineering to build route, target and way of[with] reform of the price managementstyle, to salt city charged barbed wire net engineering in the region of aftertime constuctwhole processeses in, build a price management and control of norm development withturn to build a price management a system reform deeply, have important referencevalue.
Keywords/Search Tags:Electric net, project, cost, management, control
PDF Full Text Request
Related items