Font Size: a A A

Research On Construction Agent System Management Mode Of Government Investment Project

Posted on:2009-08-20Degree:MasterType:Thesis
Country:ChinaCandidate:Y H JiangFull Text:PDF
GTID:2189360242490645Subject:Public Management
Abstract/Summary:PDF Full Text Request
With the rapid devopment of our country's modernization construction, the scale of the government extends continuously,yet the defects of government investment item mangement are also increasingly prominent.To lead to"Construction Agent System" mode in item construction by carrying on the system innovation to the construction method that the government invest the item is one of the valid measures to guarantee quality and improving efficiency,it is also an important security measure to suprress corruption from the source head. It is objective requirement that changes the government's function at the same time.Acording to the principal-agent theories,as the operation of the government investment item is a multi—level and multi-task agency relations,existing of public power entrusted-agents operating out of order, thus result in property is not clarity and the main investment is absent, producing a series of problem of the allocation of resources were seriously wasted and the low efficiency of investment.Construction Agent System has a major innovation in the introduction of market—oriented mangement, turning the adminsrative and affiliated relations of original construction item management into the princal-agent relations based on the clients,the construction people and the using people.As a result,it clarify the property right,strengthen the status of the main investment and achieve the the maximum efficiency of government investment.Construction Agent System,as a mangement modelof reforming investment system which is advocating and pushing forward,focus on government investment item in various aspects of binding norms,produces a good social effects and ecomic benefits in practice by adopting reasonable restraining mechanism to guarantee quality and efficiency of the items.The reasonab leness of the operating mechanism and system innovation beyond the traditional model testify the scientific and practicable possibility to promote the Construction Agent System.It will inevitably arise and meet some problems that are incompatible with social development and need to further be studied and resolved because it is in the experimental phase of the promotion.According to this kind of all new mangement system of our country,on the basis of analysis of the mode of our country government's investment item management at the present time,the paper analyzes substantially the problems existed in the experimental unit work of Construction Agent System of Hunan Province and put forward the corresponding solutions by drawing on experience from the foreign government's investment item management and two kinds of typical modes of China's Construction Agent System.The studies of the paper shows that China's current Constructon Agent System mode need to be further improved the keys of improving Construction Agent System are put forward from the angels of the government and the people in the paper.
Keywords/Search Tags:The government investment, item management, Construction Agent System
PDF Full Text Request
Related items