Font Size: a A A

The Researcher On Project Risk Management Of Transformer Substation's Construction In Zhuzhou Electric Bureau

Posted on:2008-09-11Degree:MasterType:Thesis
Country:ChinaCandidate:R LiuFull Text:PDF
GTID:2189360242964921Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Since the nineties of the 20th century,the academic research of project management has made considerable headway in our country, and has been used in every trade extensively. This adademic also has been applied in construction of electric net of Zhuzhou since 1998. However, the project risks do not get an enough value, not only result in the increment of construction cost, but also delay the schedule.In order to ease the project risk of transformer substation construction projects for example, studied the risk identifies in Zhuzhou, the article researched on the risk identifies, risk assessment, risk control etc.First, the article begins with the project risk source estimatin of the transformer substation in Zhuzhou. It ananlyzed the main risk factor of the project, and carried on inducing to various risk analysis system classification, formed transformer substation construction project risk analysis system.Then, the article makes use of statistics methods, based on the statistics of project risk cases of the transformer substation and results after expeerts investigating, studied the factor's influence to project. The article evaluateed the influence grade of transformer substation construction projects and discussed treament of transformer substation construction project risk based on the above-mentioned research.Finally, the article analysied Huanglan substation project in base of above-mentioned.The article takes the substation construction project and risk management as a study target , investigating some interrogative problems of the transformer substation construction project in Zhuzhou. It has certain value and practices meaning to perfect project management of substation construction.
Keywords/Search Tags:Transformer substation construct, Project management, Risk management
PDF Full Text Request
Related items