Font Size: a A A

The Shi Quan Electric Power Bureau Transformer Substation Builds The Risk Administration

Posted on:2010-03-01Degree:MasterType:Thesis
Country:ChinaCandidate:L LuFull Text:PDF
GTID:2189360275967698Subject:Project management
Abstract/Summary:PDF Full Text Request
Electric power enterprise builds project risk administration starting night,wields degree low,the degree the risk that a lot of place builds to the project is managed taking seriously has been insufficient,can be used there existing the certain fault,the cost having increased construction in investment,has delayed a project throwing luck time, has missed the best yielding results effectiveness for a given period of time.The project the main body of a book is built with Shi Quan County electric power bureau transformer substation is an example,the risk administration theory studying investigation and discussion is modern builds application in managing in county level electric power transformer substation.Secondary risk distinguishes,risk quantization,risk estimate that,risk answer the main body of a book to wait for many angles to start off,come in the enterprise work experience a gleam of supplying electricity in 10 combining with an author,data collecting the data having arranged a great quantity,the construction project has carried out thorough go into on Shi Quan County electric power bureau transformer substation, has analysed the risk source affecting main part that the project builds,has built and transformer substation construction project risk analysis system,grade go along appraises the impact of various risk factor over project.The main body of a book is built with the transformer substation with risk administration for the target studying,is probe a few problems that the Shi Quan County electric power bureau transformer substation there exists in the aspect building a project,the risk administration has theory to owing a project construction and construction project the days to come wielding value,the risk escapism has important practical or immediate significance to modern electric power enterprise.
Keywords/Search Tags:Transformer substation, transformer substation construction, risk administration
PDF Full Text Request
Related items