| Due to the characteristics of large-scale construction project are large-scale investment, long construction period, many of partners, complex technology, difficult construction, difficult manage mission, large-scale workload of project information, serious influence of society. Nowadays there are so many problems in the management of large-scale construction, especially, the problem of constructability is become more and more important. Therefore, the research of the problem of constructability is the focus and the difficulty and is also very important in realism and theory.Using the informative management theory and the project management theory, adopting the literature study method and the compare analytical method, analyzing and sum-up the problem of the constructability in the large-scale construction. Via the deep and general analyses to the problem of the constructability in the large-scale construction, take apart the cause of the constructability, that is the lack of the connection of design and build due to the separation of design and build. Therefore, it is supposed to break the limit of the traditional management so as to do the research of constructability, by adopting the new design-build model and the information technology. In that base, analyzing the meanings, framework, superiority, actuality, foreground and the character of design in the design and build model; and expatiating the concept, character, function, framework, actualizing model, establishing fashion and different products of the project information port Deeply analyzing the method of using Autodesk Buzzsaw to do the research by the model of design-build. Taking the analyses of the advantage and key factor by using the Autodesk Buzzsaw as the precondition, combine to the problem of constructability in system, discussing the method of doing research of constructability in the large-scale construction by establishing matrix framework, to integrate the design and build and using Autodesk Buzzsaw.These conclusions are got from the analyses: applying the design-build model to make the framework and applying the information management to solve the problem of constructability in large-scale construction project. Thereby sum-up the measure of resolving the problem of constructability in the large-scale construction and offer the advice and theory evidence of accelerating the program of informative management in large-scale construction,... |