The Research On Schedule And Quality Management In The 3rd Stage Of Jiao Zuo Power Plant Flue Gas Treatment Project

Posted on:2009-08-06Degree:MasterType:Thesis
Country:ChinaCandidate:Q E ZhaoFull Text:PDF
GTID:2189360242986971Subject:Project management
Abstract/Summary:PDF Full Text Request
The schedule control and the quality control are the important content in the engineering construction project management. How to improve construction quality and progress of the project goal is the problem that must be considered. For most projects, the original project management system, rules, methods and so on show that many defects in the projects. It is difficult to ensure project quality and progress of the demand. This paper analyzes the progress of the project control and quality control factors and the impact of specific measures. This article researches schedule control and the quality control methods in the 3rd stage of Jiao Zuo power plant flue gas treatment project combining the 3rd stage of Jiao Zuo power plant flue gas treatment project. For improving the construction level of the 3rd stage of Jiao Zuo power plant flue gas treatment project, this paper has Some theoretical and practical significance...
Keywords/Search Tags:Flue gas treatment, Schedule control, Quality control
PDF Full Text Request
Related items