Font Size: a A A

Risk Research On The Project Management Of Comprehensive Scientific Research Building In Shandong University

Posted on:2009-05-31Degree:MasterType:Thesis
Country:ChinaCandidate:S J WangFull Text:PDF
GTID:2189360245495111Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
Risk management is to identify and assess the facing risk, and to determine appropriate treatment methods to replace the risk of uncertain costs with the determined cost of management, and to minimize the economic cost to get the most realistic protection activities.There are some risks in the whole process of construction projects that need planning, feasibility studies, design and construction process, and so on, especially in the large-scale construction projects. The integrated research floor of Shandong University began in January 2006 and is planed to be finished in 2008 costing 430 million yuan, whose area is 128.000 square meters. Such large-scale construction in Shandong University is the first time, therefore, we must make great efforts to study the entire process of the project may face the risk of construction management and decision-making to provide basis for decision making, prevention of various types of risks brought about economic loss to schools.Based on the school administrators' point of view, the whole process of the construction project risk management was studied in this paper. Facing the features of construction project, risk identification, risk estimation, the common methods of risk assessment are introduced, and the construction projects at various stages of potential risks, risk management and cost-benefit analysis, risk management evaluation methods are discussed combining with the school calendar year Project, aimed at school construction projects of infrastructure sector to the potential risk analysis, processing, decision-making to provide a realistic and practical approach. At the same time, from the perspective of the audit track construction project, some risk management issues are explored to promote the increased level of school construction project management further, and to improve efficiency in the use of school construction funds, combining with the relevant content of the entire process of tracking audit which begins in recent years in China.
Keywords/Search Tags:risk management, construction claims, contract management, synchronization audit
PDF Full Text Request
Related items