Font Size: a A A

Study On The Contract Management Model Of Government Investment Project

Posted on:2009-08-28Degree:MasterType:Thesis
Country:ChinaCandidate:J H LvFull Text:PDF
GTID:2189360245952318Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
This paper further analysis the feature and history based on the research of the management model of government investment project which is spreading out in our country. It discusses the type of the management mode, indicates the shortage ,analysis the reason resulting in shortage and demonstrates necessity carrying out construction agent system. It sums up the advantage of the application of international professional management and the relative centralized management by comparison and research the management model of government investment project between the United States, Britain, Germany and Hong Kong .So the paper gives reform idea to carry out construction agent system.We draw a conclusion that it is more scientific and effective project management model through analysis the foundation knowledge of construction agent system. The paper analysis and compare the typical model in Beijing,Shanghai and Shengzheng. After comparative analysis, construction agent system should be market-oriented and specialization direction of the development. So it is necessary to carry out construction agent system which must meet to the implementation of model in light of local conditions.Through the principal-agent theory and some benefit conclusions geting from establishment construction agent system model, it analysis the necessity of defining the scope of project contract which is invested by government based on relative discussion between trustor and agent. It study the relationship of construction contracts commissioned by the main body and the legal status ,at the same time it defines the relationship between the Government and the built .By research the relative contract items of project invested by government, it can largely avoid the principal-agent problem and the government can achieved a higher investment income through implementation relative system and strength management method.Finally, practice in Urumqi is further to demonstrate the advantage of construction agent system .The paper analysis the problem and shortage. It discusses measurement and solutions ,meanwhile it suggest how to strength to carry out construction agent system.
Keywords/Search Tags:Government investment projects, Project management model, Construction Agent System
PDF Full Text Request
Related items