The Construction Risk Analysis And Management Of Thermoelectric Power Station Project

Posted on:2009-11-16Degree:MasterType:Thesis
Country:ChinaCandidate:X D YuFull Text:PDF
GTID:2189360272987234Subject:Project management
Abstract/Summary:PDF Full Text Request
The thermoelectric power station project has Significantly social and economic effect, but it has the characteristic of high investment ,long construction period and complicate structures. There are many indefinite factors that they have impact on the construction and the economic effect. All these factors are so random and no prediction. So there are many risks existed in the construction of the project. so it is very important to manage and research the risks of the thermoelectric power station Project in our country .Firstly, through uncertainty analysis, the system analysis, the author has utilized the project life cycle theory, has determined the risk factor detailed list, has established the thermal power items of basic construction risk assessment target system.Then, through method of the investigation and the expert, using the analytic hierarchy process , the author has established the multi-level fuzzy quality synthetic evaluation model; Through the research of this model, obtained various targets weight value,proposed the 4 degree risk classification, and has carried on the classification to various risks target, has obtained the thermal power items of basic construction risk quality synthetic value.Finally, according to the risk analysis result proposed the risk management plan, has proven established target system and appraisal model feasible and Operational in practical workIn the thesis the author has embarked from risk assessment angle of the thermoelectric power station project, has utilized many methods: the system analysis method,the qualitative analysis and the quantitative analysis unified, as well as risk management theory。This research has carried on the beneficial discussion to the risk assessment target system of the thermoelectric power station Project, has the positive frontage function that will lead risk assessment to quantitative,scientific,standardized direction, provide the reference for the thermal power construction company to better carry on the risk assessment, had certain theory value and the practical significance.
Keywords/Search Tags:Thermoelectric power station, Risk-analysis, Evaluation-model, Risk-management
PDF Full Text Request
Related items