Font Size: a A A

Study On Time Management And Quality Management On The Relocation Project Of Qingdao UNICOM MSC1 System

Posted on:2009-11-07Degree:MasterType:Thesis
Country:ChinaCandidate:Y L CuiFull Text:PDF
GTID:2189360275485798Subject:Project management
Abstract/Summary:PDF Full Text Request
There are 6 operators in China telecommunication market.In this competitive condition,how to improve consumer satisfaction and how to keep profit margin is the focus of all operators.So they all need to improve their management ability.Now most of them are extending capacity of existing network for more market share.In the thesis,the writer study the time management and quality management through the case of the first switch site remove project in Qingdao UNICOM.And discuss how to implement project time management and project quality management.The focus of the discussion is the following project management practice:Breakdown the work into manageable controllable work package by WBS. Dispatch the work package to person in charge by responsibility matrix. Make project time plan and control the progress.Make project quality plan and control the quality.Make the best of all resource.The first,the writer studies the situation of the project management study and the existing problem in the thesis.The second,the writer introduces project time management and project quality management.The third,the writer introduces the background of the first switch site remove project in Qingdao UNICOM.The fourth,Through the case of the first switch site remove project in Qingdao UNICOM,the writer discusses how to make project time plan and project quality plan.And how to control the time and the quality...
Keywords/Search Tags:Management
PDF Full Text Request
Related items