Font Size: a A A

Laiwu SanHe Technology Co. Ltd. UIPM Project Feasibility Study

Posted on:2010-05-25Degree:MasterType:Thesis
Country:ChinaCandidate:S X YanFull Text:PDF
GTID:2189360275486188Subject:Project management
Abstract/Summary:PDF Full Text Request
At present, China has become the world's largest producer of household electrical appliances, product quality and technological level has reached the international advanced level, household electrical appliances also moving toward intelligent, multi-functional, health, energy saving, environmental protection, development, security, environmental protection, energy saving control of the inverter technical response to the appliance market and technological development needs of the 21st century home appliance control system for the mainstream market, technology, frequency conversion control technology set in one of the frequency of electrical appliances also greatly sought after by consumers. In addition, since the reform and opening up of China's rapid development of power electronics market, a huge potential market demand. However, the demand for such a huge market to rely on imports, very few Chinese products.Laiwu SanHe technology Co. Ltd. successfully developed the first set in the domestic advanced technology frequency control module in one of the UIPM, the products small size, high integration, low power consumption, environmental adaptability, cost-effective, Electromagnetic Compatibility strong performance to reach the international advanced level. In order to meet the household appliances industry, technology development and market demand both at home and abroad, the company decided UIPM new module project, which invest in large, it is essential to conduct a comprehensive assessment of the demonstration. In this paper, the theory of the use of project appraisal, the project conducted a comprehensive assessment of the argument and came to the conclusion of the study feasible, but also for other demonstration projects to provide a reference for the assessment.This article writing mentality is as follows: Paper second part, third part, the fourth part from the project movement environment, project aspects and so on technical level, project environmental effect has separately carried on the qualitative analysis to the project, explained the project implementation necessity and the feasibility, fifth part, the sixth part from the project finance analysis, the risk analysis aspect has carried on the thorough quantitative analysis and the appraisal to the project, has proven this project economic value, draws the project feasible conclusion.This article key point in the financial analysis and the risk analysis part, emphatically to invested the recoupment period, only is presently worth, internal targets and so on returns ratio, and loss balance analysis, sensitive analysis has conducted the thorough research and applies in the project appraisal.The investment recoupment period, only is presently worth and internal returns ratio has many kinds of computational method, the computational method scientific critical time to the investment plan feasible or not judgment, conducts the research to these three targets to have the theory value.At the same time, the indefinite analysis not only is the risk analysis important part, also is the financial norm appraisal important supplement, also has many improvements in the method the places, carries on the judgment analysis after the improvement to this project feasibility, obtains by the time has the scientific appraisal conclusion.
Keywords/Search Tags:UIPM, Movement environment, Technology assessment, Environmental effect, Financial analysis, Risk analysis
PDF Full Text Request
Related items