Font Size: a A A

ShiAn Highway Management Capability Maturity Model Research And Application

Posted on:2010-09-05Degree:MasterType:Thesis
Country:ChinaCandidate:S W GaoFull Text:PDF
GTID:2189360275490546Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Project management capability maturity model is a new management mode that is produced and populared at twenty century.It is commonly used to project leading enterprises, but due to the highly competitive market environment and many uncertain factors, more and more enterprises to introduce the ideas and methods of project management, therefore, some traditional enterprise also try to applicate project management.ShiAn highway management belongs to the traditional operation enterprises, in ShiAn highway management trying to applicate project management capability maturity model and evaluating expressway management maturity, understanding highway management problems and the insufficiency, improving plans, improving ShiAn highway management and service level, and enhancing the core competitiveness of the highway, no matter from the model for the expansion or improving highway management level, it has practical significance. This article is trying to research and applicate management of maturity in traditional highway --ShiAn highway management.The paper first introduces the project management maturity research background, and domestic and foreign research status, the research tools, research methods.Then, the paper carefully elaborates related concepts of project management capability maturity model--explained the project management and project portfolio management, maturity and management maturity, model, and so on. based on the analysis and the explanation ,the paper determines ShiAn highway management for project portfolio management.This paper also introduces about several popular management capability maturity model , and comparates several management capability maturity model, and the two basic management capability maturity model of CMM and PMMM and ISO9000 quality management system standard, the paper tell us the enterprise of applying ISO9000 quality management enterprise also apply project management capability maturity model.Secondly, the paper analysis the factors of ShiAn highway ,and discuss the feasibility of trying to applicate the probject management capability maturity model in the leading enterprise . through the analysis and comparison of multi-level ,paper think in the no project leading enterprise ~ ShiAn expressway , the project management capability maturity model also can be applied.Based on PMS-PMMM of project management solutions company, combining with the specific situation of ShiAn expressway, the paper construct the ShiAn highway management capability maturity model evaluation index system.In order to strengthen the credibility of the index, paper use the related theory to select index as the ultimate evaluation index system.After the evaluation index system for sure, with PMS -PMMM model for each maturity level evaluation index level are analyzed in detail,and formed ShiAn highway management capability maturity model , SA-PMS-PMMM.paper sure that ShiAn highway management level measurement principles of capability maturity model. Finally, the paper will be SA-PMS- PMMM applies to ShiAn highway maturity level test on , Determine the ShiAn highway management level of maturity. According to the model of ShiAn highway,paper pointe out that the improvement project, improving direction, find out the ShiAn highway management methods of improving and maturity.
Keywords/Search Tags:ShiAn highway, Management of maturity Model, Evaluation system
PDF Full Text Request
Related items