Font Size: a A A

The Research Of LT Guangzhou Company Network Optimization Project Management Maturity

Posted on:2018-06-25Degree:MasterType:Thesis
Country:ChinaCandidate:C LiFull Text:PDF
GTID:2359330518964334Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Chinese communication industry has experienced nearly 30 years of rapid development,it has entered a stable period,and its management also from extensive mode to intensive mode.At present,the communication enterprises have the general project management knowledge and consciousness,and they also have the initiative to enhance the project management ability,so the research of the project management maturity has been continuously developed and improved.The research of project management maturity in the field of communication is based on the communication engineering,while communication engineering involves a wide range,including:transmission infrastructure,engineering,engineering,engineering,wireless exchange network optimization,billing engineering project,their difference is bigger,and if use of the same set of indicators evaluation system for them,the pertinence is obviously not strong,so the study object of this article is a communications operator of Guangzhou branch network optimization project group,so this study will more targeted and practical value.Through the research of the network optimization project management maturity and its evaluation methods,the project management situation can be accurately located,and find out the short board and the priority order which need to be improved.Because of the strong pertinence of the model,it is more popularized and instructive in the management of the network optimization project of LT Company in Guangzhou.In this paper,through empirical research on the optimization of network project of Guangzhou LT Company,with PMS-PM3 as the basic model,and taken the model with the ten project management knowledge system theory.The model taken five project management processes and comprehensive management ability as the key index for the domain,and using the Delphy method to confirmed the key indicators and screening,and then through the AHP to determine the weight of each index in the model.Finally,the maturity model is established to adapt to the characteristics of network optimization project management.In the evaluation methods selection,based on the analysis of characteristics of maturity evaluation,this article will use fuzzy evaluation method,the evaluation score combined with analysis of IPA matrix analysis,and finally summed up the implementation of effective improvement suggestions;make evaluation to form a complete system of practice to enhance.The study found that,compared to other types of communication project management maturity model,this model evaluation index is added "compile the professional technical guidance ability "," project start efficiency "and" work breakdown structure making ability","project tasks scheduling ability"," The matching ability of project goal planning and project budget" and" The matching ability of Job breakdown and resource requirements"," project information management ability","The matching ability of project objectives and project budget control","project evaluation ability","project experience ability "and" document ability" index.The types of these indicators can be derived that the model index than the traditional communication engineering maturity model of the project pays more attention to the technique and experience of repeatability and planning and resource matching capabilities and integrated management capabilities,which accords with the actual characteristics of Guangzhou LT network optimization project.In the study of determining weights,we find that the weight of the comprehensive management ability is significantly higher than that of the other five processes.In the two level indicators,these indexes like "the project management team established in timeliness","the scope of the project planning","project bidding management","project risk control ability,","project experience ability",they are the highest weight in the 5 process groups,and the weight of the "organization project management knowledge reserve capacity" is the highest in the comprehensive management ability,In this regard,we can think that in the process of project management,the project management knowledge and experience of the accumulation of a high degree of attention,so that the enterprise project management maturity can continue to improve.,otherwise the mature project management can not be discussed.In addition,we can see that the comprehensive evaluation score is 2.1943,and the maturity is the standard level of LT Company's network optimization project management in Guangzhou.In the five process groups and integrated management capabilities,the overall score of the project implementation process group is the lowest,so which should be focused on and promoted.
Keywords/Search Tags:Project Management, Maturity Model, Analytic Hierarchy Process, Maturity Evaluation
PDF Full Text Request
Related items