The Small And Medium Road Engineering Construction Enterprises Project Risk Management

Posted on:2010-05-07Degree:MasterType:Thesis
Country:ChinaCandidate:L C ZhouFull Text:PDF
GTID:2189360275977566Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The road engineering project has the strong point building a period like construction process , the amount of capital invested is big , the mass technology requires that height, the participation main body are many , membership credentials is complicated to wait for a characteristic. The project puts process middle uncertainty factor into practice many, join ceaseless change, construction project smooth the risk coming into being from this is often affected is put into effect. Disregarding being a project proprietor , contracting business , inspection and control is more square comparing with others, before project will be confronted with all kinds of risk in putting process into practice, the risk being under construction especially contracting what business frontage is the most, these may if the risk coming across not estimating that well or being not handled properly, be in the cards bringing about the project target having no way to realize , bring about heavy losses extremely , may bring about business failures gravely even. Therefore, the project risk management appears most important right away to construction enterprises.Risk has managed the main body of a book with road construction project for the object of study , has introduced development of risk management and current situation building a construction project first, secondly brief development of the construction enterprises having introduced the small and medium road engineering current situation. And and the risk administrative system answering and keeping watch according to risk identification , risk estimation and valuation, risk, sums up in small and medium road engineering construction enterprises risk may face in putting process into practice in project factor, case in being tied in wedlock the main body of a book, priority manages in the time limit for a project, cost manages , several aspect such as quality control carries out the risk analysis, how, to keep watch , avoid investigation and discussion being in progress to a few main risk factors, To improve small and medium road engineering construction enterprises project risk control level. At last, the main body of a book develop the measure keeping watch and improving to have brought forward a little risk to the project risk management and enterprise combining with the small and medium road construction enterprises characteristic.
Keywords/Search Tags:Risk management, Road engineering project, Small and medium road construction enterprises
PDF Full Text Request
Related items