Font Size: a A A

Technical And Economic Former Evaluation Of Tianjin Outer Ring Overpass Construction Project

Posted on:2010-04-01Degree:MasterType:Thesis
Country:ChinaCandidate:X ChenFull Text:PDF
GTID:2189360305487760Subject:Project management
Abstract/Summary:PDF Full Text Request
In the analysis of engineering projects technical and economic factors and lack of single factor analysis method, based on this paper, based on rough set and information entropy of the fuzzy comprehensive evaluation method. Paper is based on rough set and information entropy theory to define the indicators for the project construction the weight of the establishment of the fuzzy comprehensive evaluation model, while outer ring road overpass construction of Tianjin object of study, through analysis of Tianjin Overpass project technical and economic factors, will be based on rough set and information entropy of the fuzzy comprehensive evaluation method used in construction of the project examples, and through the results of analysis shows that the rationality of this method and effectiveness.
Keywords/Search Tags:Engineering Construction Projects, Technical and Economic, Comprehensive Evaluation
PDF Full Text Request
Related items