Risk Management Of Project Cost Of Engineering-Procurement-Construction Mode

Posted on:2011-01-18Degree:MasterType:Thesis
Country:ChinaCandidate:L M SunFull Text:PDF
GTID:2189360308971025Subject:Business management
Abstract/Summary:PDF Full Text Request
Build project is always in the variable natural and social environment in the build procedure under the Engineering-Procurement-Construction mode, because the project has a long-term building period, huge investment, and more entities participant and complex organization relationship etc. For the different sorts of project build risk and the uncertainty factor affected the cost structure in the project build risk management, it is, obviously, necessary to begin project build risk management research whether in the theory or practical.This thesis based on the project risk management theory, track the way of distinguished the project build risk, risk evaluated and risk processed, construct a project build cost risk management system. This system includes design, purchase, and the main risk in the different implement stage and the reason under the Engineering-Procurement-Construction mode, illustrate a series of steps to avoid and decrease the risk. At last take Monte-Carlo as an example stimulates the project expenditure risk evaluation.This thesis based on the build risk management theory and put it into Engineering-Procurement-Construction contract project implementation, focuses on the design, purchase and implement feature which three stages in the project risk management under Engineering-Procurement-Construction mode, give a series of project build risk response tactics which have a definite practical value.
Keywords/Search Tags:Engineering-Procurement-Construction mode, Risk Identification, Risk Assessment, Risk Process
PDF Full Text Request
Related items