Font Size: a A A

Zunyi City Grid "eleventh Five-year" Plan,

Posted on:2006-12-08Degree:MasterType:Thesis
Country:ChinaCandidate:B WangFull Text:PDF
GTID:2192360185973413Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
In order to develop the electrified wire netting construction in the city proper of Zunyi, to quicken the development of the city network, to increase the amount of the power supply, the electric energy quality & the possibility of the power supply of the city, the author finds out the problem of the electric shelves according to the analysis of the 110Kv & 10KV electric shelves, making reference to the general City Plan of Zunyi, according to the current situation & problems in the city electrified wire netting of Zunyi City. The author uses the forecasting of the past general amount of electricity & the forecasting of the amount of electricity in different districts to calculate the load & the electricity amount standard during the 11th 5-year-plan in Zunyi City after collecting the market load materials. And then, he uses the way of forecasting electricity amount in different industry to correct the forecasting results in order to make sure the load & the electricity amount standard , which is the most suitable to the 11(th) 5-year-plan in Zunyi City. The author also calculates the electric power profit & loss during the 11th 5-year-plan in Zunyi City though the electric power balance between the different electric power stations & the different districts according to the forecasting results of the electricity amount to make certain the construction projects & to direct the construction & the transformation of the electrified wire netting during the 11th 5-year-plan in Zunyi, which can lay a solid foundation to the development of the city electrified wire netting in Zunyi City.
Keywords/Search Tags:The analysis of the current situation, The load forecasting, The balance of the electric power, The plan of the projects
PDF Full Text Request
Related items