Font Size: a A A

The Gg Company Traveling Wave Tube Project Schedule Management

Posted on:2009-08-03Degree:MasterType:Thesis
Country:ChinaCandidate:X GaoFull Text:PDF
GTID:2199360245461850Subject:Business Administration
Abstract/Summary:PDF Full Text Request
GG company delays in the schedule of the new TWT developing project , the circs is very serious, has affected the company's business and development. This study enter from the phenomenon, the first under the TWT project's characteristics accord with modern project management theory expert ,TWT project used in the project feasibility analysis, followed by theoretical analysis of the project life cycle, delay of the progress of projects generated in the project performing phase ; identify affect the schedule of TWT projects and put forward the three propose solutions to the reasons for the direction; Then the use of project management theory analysis the main types of project range changes and the reasons of TWT project for the change in the scope of work out measures for the management ; application design structure matrix (DSM) theoretical analysis TWT project implementation phase of the flow of information of mutual coupling, solve by using of organize structural adjustment, as well as concurrent engineering methods; use of network planning, optimization plan of TWT project schedule .
Keywords/Search Tags:project management, project life cycle, project range management, design structure matrix (DSM), the schedule of the project plan, network planning technology
PDF Full Text Request
Related items