Cost Control Of Government Investment Projects Under The Agent System

Posted on:2012-01-12Degree:MasterType:Thesis
Country:ChinaCandidate:M ZhangFull Text:PDF
GTID:2212330338957822Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Our government investment projects have basically followed the traditional management under the traditional planned economic system which are invested and managed by government for many years. This mode have many problems,such as making decisions immature and pre-implementation phase out of touch and adjusting programs arbitrarily which can cause super size, super-budget, super-period and other issues. The agent system was produced in this context, which was promoted heavily by the government. The emerging is in accordance with such principle of separation that investment, construction, management and use must be detached in the construction engineering field.The purpose of this paper is that how to further strengthen our project cost control in order to achieve reducing cost, improving efficiency of government investment and promoting the healthy,sustained and stable development of government investment projects and ensure that the most urgently needed products and services can be implemented in the best way under the agent system about government investment projects.It is necessary to research domestic and foreign current study about cost control of government investment project agent, study advanced experience of the Western market economy countries and some areas of our country about government investment projects and summarize cost control problems about government investment project under the agent system in our country,in order to establish five stages including the investment decision-making, design, tendering, construction and implementation and completion to analysis cost control.This article puts forward a project in Zhengzhou as a case to study cost control of government Investment projects and analysis strengths and achievements of Agent System in cost control.What's more, it gives policy recommendations from the government and the EPAM to improve the efficiency of government investment according to problems about Zhengzhou Investment Projects of government, which has very important significance. Conclusions of this article are that government investment projects should be promoted continuously and pay full attention to cost control; the design phase should implement bidding system,promote quota design and emphasize optimization design in Value Engineering Method; all directions contract management; promote the engineering bill pricing model; improve the evaluation methods of endering; make dynamic statistics and analysis of project funding well; attach importance to project post-evaluation. All of these above have some theoretical guidance and practical significance.
Keywords/Search Tags:government investment projects, the agent system, cost control, investment returns
PDF Full Text Request
Related items