Font Size: a A A

Wu-Guang Passenger V Tendes Crucial Problem Management Research

Posted on:2012-07-30Degree:MasterType:Thesis
Country:ChinaCandidate:S D ChenFull Text:PDF
GTID:2219330338466927Subject:Project management
Abstract/Summary:PDF Full Text Request
With the start of construction of large-scale passenger line, how to ensure the Construction quality of passenger line in the first place. According to the participation of the Wuhan-Guangzhou Passenger Dedicated Line Project as the background, in-depth analysis and study of the passenger line's construction organization, and technology management, through the construction of the Wuhan-Guangzhou passenger line thought the organization and summary of the passenger line for future projects provide useful experience.First, the paperⅤWuhan-Guangzhou passenger line summarizes the subject of the construction and research organizations, the duration of the high-speed railway and construction of the relationship between resource allocation are summarized to reveal the relationship, for the future construction of passenger line provides a reference basis.Secondly, the paper focused on the subject of Wuhan-Guangzhou passenger lineⅤpassenger line construction management and key technologies. Including the project schedule management, major construction technology program, time targets and assurance measures to ensure safety and quality objectives and measures for water environmental protection and occupational health measures, labor organizations, major equipment configuration, the main material supply, civil construction and other key technologies and conservation Construction Management.Again, this article passenger line of new technologies, new processes were introduced.Finally, the article also points out the passenger line construction experience and lessons learned, and proposed future construction considerations.Through this study, a similar attempt to provide passenger line construction project management and technology management, organizational reference.
Keywords/Search Tags:PDL, project management, time, roadbed, bridge, tunnel, box, post settlement, Ballastless
PDF Full Text Request
Related items