Font Size: a A A

The Research On Programme Management Maturity Model That Applies To Notrh Of Shenyang Newly Developed Area Road Net Facilities Construction Project

Posted on:2013-08-24Degree:MasterType:Thesis
Country:ChinaCandidate:H L ZhangFull Text:PDF
GTID:2232330371979866Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, with the development of urbanization, urban road construction scaleenlarged, and the construction scale grows year by year. In our country road networkconstruction project management for the concept is still not mature, because the constructionfield management level of the enterprise is generally low. How to improve the constructionenterprise project management ability to become the enterprise the focus. This paper mainlyby Shenyang northern new city road network construction engineering projects for theresearch background, in the digestion and absorption of project management maturityresearch results at home and abroad, on the basis of the theoretical research and empiricalresearch, combining qualitative and quantitative research method of combining the,combined with the new construction project is north road network, t Use of expert evaluationof the project management maturity evaluation method to the project management of thebasic evaluate.First, this paper the research background, the research significance, the researchpurpose carry on the elaboration, points out that the combined with the new networkconstruction project is north of the plan and the present situation of the management of theexisting, establish the project management maturity model, to ensure the smooth progress ofthe project, the comprehensive evaluation of the project management in the process of thedefects of the find, and the time to try to improve has important significance.Second, through to the project management capability maturity model concept,characteristics, basic elements of the analysis, this paper expounds the capability maturitymodel as a project management of construction of basic elements and the steps, at the sametime for this project management capability maturity model for providing full of theoreticalbasis.Third, analyzes the new city road network construction project is north of the actual conditions, project development steps, plan for the system is discussed in projectmanagement capability maturity model selection for the elements of the practice basis.Fourth, through the model with the project management factors actual managementstatus compared, for by the possibility of the model, in combination with the characteristicsof the project construction of the road network model of the key factors used screening, anddesigns the north road network construction project management is maturity evaluationfactors and index.Fifth, according to the new north road network construction is project managementevaluation complexity and fuzziness of maturity characteristics, through the maturity leveland construction project management factor2d the construction of the indicator system,using the questionnaire survey and assessment of expert way, only of the new networkconstruction project management north maturity to evaluate, for the project management forthe evaluation on the maturity a scientific evaluation methods and tools, also show themaneuverability of the application of the model.
Keywords/Search Tags:North of Shenyang Newly Developed Area Road Net, Project management, Maturity Model
PDF Full Text Request
Related items