| China’s investment project evaluation after20years of development history can be divided into research and start of the post-evaluation, after evaluation of the pilot and initial promotion, after evaluation of the rapid development of three stages, showing increasing emphasis to promote speed increasingly the sooner, the institutional mechanisms to gradually improve, continue to improve the rules and regulations, project type diversification, diversification of evaluation methods, vigorously improve after evaluation of the level of service, continue to expand the development trend of the functional role.Xuchang vocational and technical college gymnasium project planning covers an area of about40000square meters, the gymnasium points is given priority to building and training venue, elevation difference between indoor and outdoor is0.6m. A total construction area:15900m2, including underground, about2000m2, the building area of13900m2, building area of about10070m2. Xuchang may undertake after the completion of the vocational and technical college stadium volleyball, basketball, handball, table tennis, tennis, gymnastics, weight-lifting and so on national single big games, at the same time can provide large-scale theatrical performances, the masses collective activities of the activities. Xuchang can not only change the authors after the completion of the vocational and technical college gymnasium stadium less than the actual situation of, meet the needs of authors citizen sports activities, to improve at the same time the authors urban functions, improve the urban visibility and opening wider to the outside also will produce good effect.Taking xuchang vocational and technical college gymnasium project as a case, using the fuzzy mathematics comprehensive evaluation method, comparative method, with a review of the project comprehensive, analysis, evaluation, summing up experience and lessons, as well as other engineering to actively carry out Suggestions after evaluation, as well as the college issues during project implementation operation improvement measures are proposed, so as to achieve the aim of improve the effect of investment to use. |