Research On Risk Management Of Urban Rail Transit Project In Preliminary Stage

Posted on:2013-10-21Degree:MasterType:Thesis
Country:ChinaCandidate:M F MaoFull Text:PDF
GTID:2249330374488875Subject:Project management
Abstract/Summary:PDF Full Text Request
The preliminary stage of project is the important period of risk management of the rail transit project. In the preliminary stage of rail transit project, these are a lot of uncertainty factors. The main likely caused risk loss is not fully estimate actual situation and eager to start it at once. This leads to expose many problems in each stage at later stage of project. The result is that the project fails and wastes lots of resources. So, risk management in preliminary stage has a direct impact on rail transit project whether the proper implementation and the realization of operating benefit or not. The aim to researching the risk management problems of the rail transit project in preliminary stage is to effectively avoid and reduce the risk loss of construction projects and ensure the economic, social and environmental benefit that have important theoretical and practical significance.This paper took Chang-Zhu-Tan inter-city railway as an example and made research on the risk management problems of rail transit project in preliminary stage. Reviewing relative literature and theological methods and taking operational experience from built Chang-Zhu-Tan inter-city railway and domestic and international rail transit, it has made a qualitative analysis on the public policies, market, technology, organization and management and other risks. It can draw a conclusion from analyzing that economic, technology, organization and management are the three mainly risk of Chang-Zhu-Tan inter-city railway.Aiming to various risk instances and characters that the project may face up, some corresponding countermeasures which are against the risks, take the public policies, economic, technology, organization and management for example, have been brought forward last. These countermeasures are implementing risk management of the external conditions, establishing the risk management plan, formulating risk management plan and comprehensive measures of risk management, and implementing the risk monitoring and risk management measurement. This paper will provide certain theoretical and practical guidance to ensure the Chang-Zhu-Tan inter-city railway construction projects implement smoothly.
Keywords/Search Tags:rail transit project, risk management, Riskidentification, Risk analysis, Risk assessment, Chang-Zhu-Tan inter-cityrailway
PDF Full Text Request
Related items