Shaoguan Iron And Steel Billet Caster Selection Of General Contractor For EPC

Posted on:2013-06-04Degree:MasterType:Thesis
Country:ChinaCandidate:S Y KeFull Text:PDF
GTID:2249330374976120Subject:Project management
Abstract/Summary:PDF Full Text Request
"EPC" is the "Engineering","Procurement","Construction" in the abbreviated form,"EPC" mode, also known as "design Procurement Construction of" general contractingmodel, the rise in the eighties, the general used in industrial investment projects. As a result offeatures tender, EPC project does not fit the traditional mode, tendering, bid evaluationmethod of choice of contractor. Although our model from the pilot to promote the EPC hasbeen more than twenty years, but have not set up a contractor for EPC project selectionprocedures and methods. This paper closely around the theme of EPC contractor selection ofprojects, at the conclusion of the EPC model domestic and foreign research and select avendor based on the systematic study of the EPC project success factors, select the contractorof the modalities, procedures and methods, focusing on analysis the EPC phase of the projectpre qualification and bid evaluation choice of contractor.Reserach on large engineeringprojects in the future EPC select contractors have greater theoretical basis and reference value.The author also hope that through this research on promotion of EPC model used at,cultivating EPC general contracting construction market can play a positive role.No eight machine eight strand billet caster of no future projects in the steel marketstrategic significance obviously, adopt EPC means construction of engineering schedule, timeand quality plays a vital role, but how in the EPC mode selection for SISG contractor is atopic worthy of study. This article from the introduction of Shaogang eight machine eightstrand billet caster selection of EPC general contracting the background and the significance,the domestic and international successful large caster project EPC contract mode, andcombined with the previous construction at continuous casting machine take the contractmode of experience conducting research, then introduces the project background and generalsituation of the project the main contents include steel company, the development history andcurrent situation, company project organization, eight machine eight strand continuous castingmachine project characteristic and technological process. Then using AHP method andcomprehensive evaluation method, the formulation of the eight machine eight strand billetcaster project EPC contract plan, and according to the eight Shaogang machine eight strandbillet caster project EPC contractor selection study. According to the results of analysisselection meet the requirements of the project EPC suppliers, to ensure that no eight machineeight strand billet caster project construction progress, quality and time according to the planto realize. At the end of the eight Shaogang machine eight strand billet caster project EPC specific implementation are analyzed, the effect was evaluated, and the project of EPCcontracting experience and enlightenment.Results of this study show that the use of large projects in the comprehensive evaluationmethod to choose the EPC contractor on the project schedule, time and quality is a reliableguarantee, owners are expected to achieve results. For metallurgical progress of large projects,quality management has a certain reference.
Keywords/Search Tags:Contractor Selection, EPC projects, Billet Caster
PDF Full Text Request
Related items