Font Size: a A A

CPM Application Study On PC760Project Management In DSIC

Posted on:2014-01-19Degree:MasterType:Thesis
Country:ChinaCandidate:W ChenFull Text:PDF
GTID:2249330398950564Subject:Business administration
Abstract/Summary:PDF Full Text Request
over the past few years, due to the influence of raw materials, labor costs and other factors, shipbuilding industry costs continue to rise, the world ship market continued to slump, caused the Chinese shipbuilding enterprises with the decline in orders, trade deficit increased gradually. Dalian shipbuilding industry is facing the opportunities and challenges in the market, but as a result of the production system, the ship production period is long, low production efficiency is common, thus improving the level of production management, to speed up the ship construction speed, shorten the production period, Dalian shipyard on the growth of economic efficiency, improve market competitiveness has important significance.Based on the PC760product series of ship of the shipyard, the use of critical path method principle, in Dalian shipyard production under the conditions of limited resources, applying time-resource optimization method, so that the full and balanced use of resources, reduce PC760production period, improve the competitiveness in ship market. The ideas and methods of using the critical path method to solve the problem, carries on the analysis to the whole process of the production process, and take a series of measures to improve production and management methods, from the fundamental solution to the Dalian shipbuilding industry faces the production efficiency is low, the construction of a long cycle problem.Affected by the global financial crisis, the global shipping market has entered a new-stage of adjustment. At the same time, Dalian shipyard in order to meet the market demand, continue to shorten the production period, improve production efficiency and economic benefits, all kinds of mold production management mode. With the design, production and management reform, production and management situation is a good development trend, do a job with skill and ease in the face of shipping market of shipping market demand change radically. The application of critical path method also play an important role in.
Keywords/Search Tags:the competitiveness, the production period, the critical path method (CPM)
PDF Full Text Request
Related items