Font Size: a A A

Empirical Research On Relationship Between Knowledge Workers’ Job Satisfaction And Turnover Intention

Posted on:2012-11-30Degree:MasterType:Thesis
Country:ChinaCandidate:C Y MaFull Text:PDF
GTID:2251330395978394Subject:Project management
Abstract/Summary:PDF Full Text Request
Laboratory Information Management System (LIMS) is a essential tool of modern laboratory data and resource management. In the construction process of LIMS the proper management method is to used to get the desired effect. This paper introduces the application of project management theory and method of the construction of the system and the ping LIMS refinery process, as well as the project after completion of the acceptance method are introduced, the main content as follows:(1) LIMS first introduced the definition of LIMS and history of its development, trends and related theories, and elaborated the system involves the construction of related technologies and standards, combined with domestic and international LIMS applications, research status of the narrative about the advantages of LIMS, Points out that the LIMS is the only way of laboratory modernization construction.The complexity of the construction from LIMS leads the project management approach must be used to ensure the success of projects, while project management process group theory was introduced.(2) Second, start with project management, planning process, the LIMS project feasibility analysis, project team building and project needs analysis, project and resource management, business research content described in detail; a brief introduction to the project implementation process, including functional module and its implementation and other aspects of system security; the process of monitoring the progress of the project management, quality management and risk management is introduced.(3) After completion of the project as use party is concerned about the focus of the acceptance. In the end of the paper, first it introduce the preparatory work on the project including training, commissioning, expert team of set, etc., after the implementation of functional modules from the system, the overall operating results and the results are the three aspects of the system was acceptance. By actual data and charts, the results of project implementation has been verified and description, while the benefits generated by the project are described.(4) The successful experience of LIMS project construction are summarized, make outlook the future for the project. At the same time in the LIMS project the effective application of project management, systems, obvious advantages of integrated solutions are summarized.
Keywords/Search Tags:Laboratory Information Management System (LIMS), project management, laboratory management, project management process groups
PDF Full Text Request
Related items